Gas meter placement is hinging on where a NIPSCO engineer will allow us to put it. Kenny contacted NIPSCO Engineer Robert Eberle to get contact information for DTSB Engineer. It was reported that Dustin Walker was the engineer for DTSB and will be going on vacation starting 8/31/2022 for two weeks and that Robert would help get the lateral locations involved in order to get our stub-outs ready for gas meter installation.